FG to shut Third Mainland Bridge for maintenance, July 24

0
fashola

The Third Mainland Bridge is the longest of three bridges connecting Lagos Island to the mainland. 

The Federal Government has announced plans to shut down the Third Mainland Bridge for maintenance work from July 24, 2020. 

This was disclosed by the Federal Controller of Works in Lagos, Mr Olukayode Popoola, during an interaction with the News Agency of Nigeria (NAN) on Monday July 6, 2020. 

About The Author

Spread the love

Leave a Reply

Your email address will not be published. Required fields are marked *